Armenia 8-10 t/h Cement Grinding Project
Release Date: 2021.01.08 Views:

1. Project Overview


Project address: Yerevan, Armenia

Product name: Cement grinding (clinker, gypsum, slag)

Production scale: 8-10 per hour

Service Scope: Process design of the entire line, including raw material transportation, grinding, finished product storage and transportation system, dust collection system, electrical, etc., equipment supply, equipment transportation, etc.

 

The client's company address is Moscow and established a branch in Armenia. Currently they have two cement grinding lines in Armenia, and want to install a new grinding production line with 8-10 tons per hour output.

 

The entire production line includes: belt scale, belt conveyor, crusher, ball mill, fan, bag filter, screw conveyor, electrical equipment, etc.

 

2. Equipment List


No.

Product Name

Model

Qtys

1

Belt scale

B500×1800

3 Sets

2

Belt Conveyor

B500×37.1m

1 Set

3

Hammer Crusher

PC0806

1 Set

4

Screw Conveyor

LS250×4700

1 Set

5

Cement Mill

Ф1.83×9m

1 Set

6

Bag Filter

PPC32-3

1 Set

7

Fan

9-19№8D

1 Set

8

Electrical System

 

1 Set

 

3. Shipment Photos




Contact Us