1, the cement mill operation and maintenance personnel should be familiar with the structure and properties of cement mill grinding equipment and the parts of the name, size, role.
2, the cement mill operator in accordance with the "four" principles, to provide lubrication map labeling requirements lubrication ministries, not the use of untreated waste oil, lubrication points to keep clean.
3, in cement mill operation NOTE inspection departments bearing temperature does not exceed 60, and check the cement mill availability of loose bolts ministries, with or without abnormal noise, to the mine water is uniform, seamless tube with plasma phenomena, the cement mill electrical current, voltage is normal. Transmission of the shield is intact.
4, to keep cement mill equipment clean and sanitation, in addition to working parts, the remaining parts have to be ready to deal with.
5,cement mill repair cycle: 1, revised 1 month; 2, minor repairs 1 - 3 months; 3, repair 12 - 24 months; 4, overhaul 60 - 120 months.
6,cement mill revised: mainly the oil, adjust the gap ministries, departments and strong bolts, replacement or inspection of individual liner liner wear, repair feeder.
7,cement mill minor repairs: Check the wear of tooth cleaning measured, check lining wear, replace them when necessary.
8,cement mill repair: replacement feeding some of the parts, the replacement drive small gear wheel and bearing,Gearbox disintegration inspection. Great gear running 3 - 5 years can be adjusted depending on the circumstances the use of hollow shaft running 3 - 5 years should be measured.
9,cement mill overhaul: the disintegration of inspection cleaning, measurement, according to wear, repair or replace a large gear, hollow shaft, spherical bush, drive shaft, pinion and the barrel, repair replacement of electrical components, electrical equipment repair, you must run the acceptance test- work.
If you buy cement mill device, consult the price of cement mill, please contact Henan zhengkuang mining Machinery Co.,Ltd!please telephone us: 0086-0371-55902866 or leave us a message: info@zkcorp.com and the cement mill professional technological staff will serve you all day long.