I. Equipment Description
1.1 Main Equipment Name: φ1.5×3.6m Ceramic Ball Mill
1.2 Key Equipment Parameters:
Technical Parameters of φ1.5×3.6m Ceramic Ball Mill
| No. | Parameter | Unit | Value/Specification | Remarks |
| 1 | Specification | m | φ1.5×3.6 | |
| 2 | Type | - | Wet Grate-Type | |
| 3 | Effective Cylinder Volume | m³ | 5.25 | |
| 4 | Cylinder Rotation Speed | r/min | 26.6 | |
| 5 | Processed Material | - | Oil Sludge (60% moisture) | |
| 6 | Feed Particle Size | mm | <10 | |
| 7 | Solid Content | % | 10–20% | |
| 8 | Discharge Particle Size | Mesh | 150 | 85% passing rate |
| 9 | Processing Capacity | m³/h | 10 | Total solid-liquid mixture |
| 10 | Motor | Power | kW | 55 |
| Voltage | V | 380 | ||
| Frequency | Hz | 50 | ||
| Speed | r/min | 740 | ||
| 11 | Reducer | Gear Ratio | - | i=4 |
II. Client Project Overview
The client is a well-known publicly listed oil company in China. To support its development needs, the company aimed to treat and resource-utilize oil tank bottom sludge. After detailed discussions and process testing with the technical engineers from Zhengzhou Mining Machinery, the experimental data fully met the client's requirements.
The R&D technical solution) was successfully transitioned to production in May 2025. The project was publicly tendered in June 2025, and ZKM won the bid based on its professional technical expertise and extensive project experience. The contract was signed in July 2025.
By October 2025, the ceramic ball mill and its supporting equipment were procured and manufactured. The project is currently awaiting installation and commissioning.