Program to solve the cement rotary kiln drive gear and the spring plate bolts
Release Date: 2012.01.06 Views:

1 to adjust the power head cement rotary kiln boring device to the output shaft centerline and the centerline hole spring plate bolts as coincidence, the error is less than 0.10mm.

(2) remove cement rotary kiln gear and spring plate bolts and remove oil around the bolt holes.

3 cement rotary kiln with a positioning pin the gear to link up with the spring plate. And then welding the gear and spring board spot between the ears together. Then the pin on each side of the installation of a sliding bearing frame and bearing shelves with four M16 bolts are top silk cloth to adjust, and make the frame and pin bearing cement vertical rotary kiln. At this time, then the top wire fixed to the spring plate on the ears. Remove the nut on the top wire, remove the bearing and the positioning pin.

4 once again installed in the cement rotary kiln bearing frame bolts on the top wire, and secure the position. Install arbor, tool, and by universal joints to link up with the power head unit, adjust the power head unit cement rotary kiln is to find the location of the knife.

5 open from cement rotary kiln power head unit, feed unit through manual tool to achieve the level of axial feed processing capacity.

6 each hole through roughing, finishing, at least 2 times the level of feed processing tool, and finally achieve the technical requirements for cement rotary kiln boring so far, the surface roughness Ra ≤ 12.5mm.

7 cement rotary kiln boring, remove tile racks and arbor, etc., and remove the power head unit, size of field measurement boring, according to the amount of interference +0.015 ~ +0.035 preparation of the new bolts.

8 In order to achieve the reinforcement effect, according to a new preparation of cement rotary kiln bolt diameter, the use of interference with the preparation of two δ50 × Фd × Ф120mm reinforcement ring. First of a circle and hot charging reinforced cement rotary kiln to the new root of the preparation of the bolt and then bolt together with the cement rotary kiln into gear with a hammer spring plate connected with the hole, then heat the other side of the reinforcement ring mounted securely, and to tightening bolts, and finally to both sides of the reinforcement ring welded to the spring plate on the ears, from the positioning of reinforcement role.
9 Repeat the above process, the preparation of 12 spring plate bolts, cement rotary kiln in the body of the last 8 hours after the operation, re-tighten the 12 bolts.
Henan Zheng Machine Co., Ltd. is engaged in mineral medium and large series of rotary equipment manufacturers, including: rotary kiln, rotary kiln and other large non-standard-based heavy machinery, rotary kiln main R & D, manufacturing and sales, our services Value, quality and low price to win customers' trust rotary kiln! Field trips are welcome to buy rotary kiln. If you have a rotary kiln related problems need consultation, please feel free to contact me, rotary kiln 24-hour hotline: 0371--55902866. Related Links See: www.inczk.com.

Contact Us